top of page
Transparent_web design.png

Crescent Road Multi-Use Trail Ribbon Cutting

A ribbon cutting was held on June 15th to celebrate the completion of the Crescent Road multi-use trail project. MJ was responsible for design and construction inspection services for a one-mile asphalt trail connecting the Towns of Clifton Park and Halfmoon in Saratoga County. The pathway extends from Dunsbach Road to Okte Elementary School. In addition to the pathway, the project included upgrades to two intersections and installation of pedestrian accommodations, including crosswalks, sidewalks and enhanced shoulders along Crescent Road.

“Both towns worked very hard on this project,” Clifton Park Town Supervisor Phil Barrett said at the June 15th ceremony. He pointed out that the area along Crescent Road is particularly busy, and that the new trail not only adds to the large trail network that the Town is trying to create, but also allows pedestrians to safely travel near and around the highway. “These connections are bringing a tremendous amount of value to Clifton Park. This is just another step forward to completing our trail master plan and exponentially increasing our trail network,” Barrett added.

Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page